Get the latest updates on AI-powered hiring, career growth, and technical deep-dives delivered to your inbox.
Manitoba Hydro
Planning Engineer
Winnipeg, MB
Manitoba Hydro is consistently recognized as one of Manitoba's Top Employers! We are a leader among energy companies in
North America, recognized for providing highly reliable service and exceptional customer satisfaction. Join our team of Manitoba's
best as we continue to build a company that champions safety, supports innovation, and delivers on our commitment to customer
service - while actively fostering a diverse, equitable, and inclusive workplace reflective of the communities we serve.
Great Benefits
community.
We're looking for a Planning Engineer to join our Grid Infrastructure Planning Department. Under the direction of the Senior Planning
Engineer performs planning studies to evaluate future power system performance under a range of uncertain conditions. The role
supports long-term transmission and sub-transmission planning by developing study scenarios, assessing system constraints, and
providing technical insights to guide planning decisions.
additions, and emerging technologies.
assessments, system impact analysis, and identification of required transmission and sub-transmission reinforcements.
supporting long-term expansion strategies.
constraints, reliability risks, and develop cost effective mitigation solutions.
recommendations.
customer engagement activities related to interconnection and planning studies.
which two years must be directly related to the analysis and planning of electrical power systems.
specified amount of time).
asset.
manufacturers, consulting engineers, and other utility representatives.
groups.
Reference Code: CO57218827-01
would be an asset.
Starting salary will be commensurate with qualifications and experience. The range for the classification is $48.74-$67.29 Hourly,
$93,398.24-$128,947.78 Annually.
Apply Now!
Ready to join a team that energizes Manitoba and puts safety, innovation, and inclusion at the heart of everything we do? Visit
www.hydro.mb.ca/careers to learn more about this position and to apply online.
Application deadline: JULY 28, 2026.
We appreciate your interest in Manitoba Hydro and thank all applicants. Only those selected for the next stage of the selection
process will be contacted.
If you require accommodations during the recruitment process or need this posting in an accessible format, please let us
know - we're committed to a barrier-free experience for all candidates.
Most resumes get rejected by the ATS before a human sees them. Check yours free in 30 seconds.
Matched to your profile
We surface this role because it matches profiles like yours, not because we vet the employer. Always confirm the pay, location, and remote details on Manitoba Hydro's official site before you apply.
Most large employers screen resumes with software before a recruiter ever sees them. Check yours against this role in seconds. Free, no sign-up.
See the exact keywords from this posting your resume is missing, with an instant ATS score.
Open free toolUpload your CV for an instant 0-100 score and the fixes recruiters and ATS look for.
Open free toolGenerate a clean, single-column resume that parses correctly and gets past the filters.
Open free toolOther live openings in the same field. All are still accepting applications.
Irving Shipbuilding
Dartmouth, NS
Stantec
Winnipeg, MB
City Of Edmonton
Edmonton, AB
EPCOR
Edmonton, AB
Pantheon Inc.
Edmonton, AB
Tatham Engineering
Ottawa, ON